Power & Energy
Kickoff with GE Vernova and GTPL
A kickoff meeting with GE Vernova and GTPL for the supply and installation of two gas turbine generator units.

At a glance
Client
Ghana Thermal Power Limited (GTPL)
Sector
Power & Energy
Location
Alisa Hotel
Year
2026
Our role
Project management consultancy
01
The challenge
Two gas turbine generator units are to be supplied and installed for GTPL's 1,200 MW gas-fired power plant at Kafodzidzi–Abrobiano.
02
Our approach
The session covered technical clarifications on the generator design and drawings, open contractual and design-basis queries, the Installation Test Plan (ITP) and inspection regime, logistics and early-delivery options, manufacturing supervision, and the ongoing communication and reporting cadence between the parties.
03
The outcome
In progress. Results will be shared as the project moves forward.